2023 Resurfacing Project

Project Location:  Various streets throughout Hanover Park
Phase: Construction
Project Status: Bids Received
Bid Opening Date: March 23, 2023 at 11:00 am
Mandatory Pre Bid Meeting: No
Construction Start Date: 2023
Construction Completion Date: TBD
Contractor: Schroeder Asphalt Services
Construction Engineer: In-House
Design Engineer: HR Green 
Awarded Construction Amount: $3,561,913.05
Adjusted Final Construction Amount: TBD
Funding Source(s) MFT, Rebuild Illinois (RBI)

To improve the condition of the roadway by means of resurfacing the asphalt pavement of various streets throughout the Village. 

DESCRIPTION: 

The project consists of the mill and overlay of the selected pavements.  It also includes any necessary road subgrade patching, structure adjustments/improvements, curb ramp improvements to comply with current ADA requirements, and all necessary restoration work.

Construction Update - 11/3/23

The only work remaining on the project is punch list work, which the contractor is currently addressing. The project will be closed once the punch list items are complete.

If there are any concerns, please contact our office immediately since the project will be closed shortly.

For a location map, please visit our website (Engineering / Construction Projects -https://www.hpil.org/1117/Construction-Projects)

As a part of this project, 41 street sections were improved (approximately 7.16 miles). The work included spot drainage improvements (e.g., curb and gutter replacement), spot sidewalk removal and replacement to meet the current Americans with Disabilities Act (ADA) standards, pavement patching, removal and replacement of the existing asphalt surface, pavement markings, and necessary restoration.

If you have any questions or concerns regarding construction activities, please contact Public Works at 630-823-5700 for additional information.