OBJECTIVE:
To slow down the deterioration of the Village's asphalt pavements.
DESCRIPTION:
This project includes crack sealing of various streets throughout the Village as well as crack sealing, sealcoating, and striping of the north commuter parking lot. The use of a crack seal agent prevents moisture, dirt, and debris from entering the pavement at locations where it was not intended, slowing down the pavement at locations where it was not intended, slowing down the pavement deterioration. Installation of a sealcoat helps reduce raveling (loss of aggregate) on the surface of the asphalt pavement.
8/23/23 UPDATE:
The streets portion of the crack sealing has been completed. The Metra parking lot sealcoating is scheduled to begin Friday, August 25, 2023. The parking lot will be closed from 6:00 AM on Friday, August 25th, through Sunday, August 27th. Maintenance work will take place on Friday and Saturday. The 2023 Car & Motorcycle Show is on Sunday, August 27th.
For a location map, please visit our website (Engineering / Construction Projects).
This project consists of crack routing and fiber-asphalt crack sealing existing asphalt pavements at various locations throughout the Village of Hanover Park. The project also includes sealcoating parking lot areas and striping.
The public will have access to the streets during construction; however, minor delays may occur. Access to the Metra parking lot during operation will be suspended. If you have any questions or concerns regarding construction activities, please contact Public Works at 630-823-5700 for additional information.