Provide residents with a safe and continuous non-vehicular access to Metra and Pace Buses. Eliminate existing gaps in the current multi-use path network.
DESCRIPTION:
The project consists of the installation of a new multi-use path between existing bicycle paths. It will provide a continuous path to the Metra Station.
UPDATE 10/13/23:
The Phase I Engineering contract is expected to be awarded in the coming weeks, followed by the design for the multi-use path, which is expected to begin in November 2023, with construction in late 2025/early 2026.